Mostrar registro simples

dc.contributor.advisorFan, Fernando Mainardipt_BR
dc.contributor.authorMedeiros, Matheus Sampaiopt_BR
dc.date.accessioned2025-08-27T08:01:09Zpt_BR
dc.date.issued2025pt_BR
dc.identifier.urihttp://hdl.handle.net/10183/295821pt_BR
dc.description.abstractEm maio de 2024, o estado do Rio Grande do Sul, no sul do Brasil, enfrentou uma inundação sem precedentes que impactou severamente Porto Alegre e sua região metropolitana. Os níveis do Guaíba ultrapassaram todos os registros históricos, atingindo 5,37 metros no dia 5 de maio de 2024, superando o pico anterior de 4,76 metros registrado em 1941. Em resposta a esse evento extremo, uma equipe do Instituto de Pesquisas Hidráulicas da Universidade Federal do Rio Grande do Sul (IPH/UFRGS), mobilizou esforços de maneira voluntária para realizar previsões operacionais emergenciais diárias dos níveis do Guaíba durante o evento. Apesar dos desafios, o sistema de previsão conseguiu identificar com sucesso momentos críticos da inundação: níveis superiores a 5 metros com uma antecedência operacional de 3 dias; não ocorrência de níveis acima da cota dos diques de 6 metros; um segundo pico acima de 5 metros com uma antecedência de 8 dias; e a longa duração da inundação, que se estendeu por cerca de 30 dias. A precisão das previsões foi fundamental para a implementação de medidas de mitigação, como evacuações preventivas e ações emergenciais. Este estudo destaca os aspectos técnicos e operacionais das previsões, destacando os aprendizados obtidos ao longo do evento e a importância de uma abordagem integrada na gestão de eventos extremos.pt_BR
dc.description.abstractIn May 2024, the state of Rio Grande do Sul, in southern Brazil, experienced an unprecedented flood that severely impacted Porto Alegre and its metropolitan region. Water levels in the Guaíba River exceeded all historical records, reaching 5.37 meters on May 5, 2024, surpassing the previous peak of 4.76 meters recorded in 1941. In response to this extreme event, we mobilized efforts to perform daily operational forecasts of Guaíba water levels during the event. Despite the challenges, the forecasting system successfully identified critical moments of the flooding: flood levels exceeding 5 meters with a 3-day operational lead time; non-occurrence of levels above the 6 meters levees top; second peak above 5 meters with 8-day lead time; prolonged duration of the flooding around 30 days. The accuracy of the forecasts was crucial for mitigation measures such as preventive evacuations and emergency actions. This study emphasizes the technical and operational aspects of the forecasts while also highlighting the lessons learned throughout the event and underscoring the importance of an integrated approach in managing extreme events.en
dc.format.mimetypeapplication/pdfpt_BR
dc.language.isoporpt_BR
dc.rightsOpen Accessen
dc.subjectHydrological forecasten
dc.subjectCheias : 2024 : Rio Grande do Sulpt_BR
dc.subjectExtreme eventsen
dc.subjectPrevisão hidrológicapt_BR
dc.subjectEventos extremospt_BR
dc.subjectFlooding in Guaíbaen
dc.subjectGuaíba, Lago, Bacia do (RS)pt_BR
dc.subjectForecast of unprecedented eventen
dc.titleA inundação sem precedentes de 2024 no sul do Brasil vivenciada como um previsor hidrológicopt_BR
dc.typeDissertaçãopt_BR
dc.contributor.advisor-coPaiva, Rodrigo Cauduro Dias dept_BR
dc.identifier.nrb001292276pt_BR
dc.degree.grantorUniversidade Federal do Rio Grande do Sulpt_BR
dc.degree.departmentInstituto de Pesquisas Hidráulicaspt_BR
dc.degree.programPrograma de Pós-Graduação em Recursos Hídricos e Saneamento Ambientalpt_BR
dc.degree.localPorto Alegre, BR-RSpt_BR
dc.degree.date2025pt_BR
dc.degree.levelmestradopt_BR


Thumbnail
   

Este item está licenciado na Creative Commons License

Mostrar registro simples